From China to USA, India Leads: How AP’s BKV Corridor Shattered 4 Guinness World Records in One Week - AP Events
In January 2026, the National Highways Authority of India (NHAI) etched its name in history books by setting four Guinness World Records during the construction of the Bengaluru–Kadapa–Vijayawada Economic Corridor (NH-544G).
This feat, achieved near Puttaparthi in Andhra Pradesh, is a masterclass in modern engineering and a massive signal of AP’s upcoming industrial boom.
Andhra Pradesh on the Global Map: 4 Records, 1 Corridor
The recent announcement by Union Minister Nitin Gadkari highlights a monumental shift in how India builds its lifelines. The NHAI, in collaboration with Rajpath Infracon Private Limited, broke its own benchmarks through two high-intensity phases of construction.
The Record Breakdown
| Achievement Date | Milestone Recorded | Scale of Accomplishment |
| Jan 6, 2026 | Longest continuous paving (24 hrs) | 28.89 lane-km (3-lane wide section) |
| Jan 6, 2026 | Highest quantity laid (24 hrs) | 10,655 MT of Bituminous Concrete |
| Jan 11, 2026 | Total continuous paving length | 156 lane-km (Surpassing previous 84.4 km) |
| Jan 11, 2026 | Total Bituminous Concrete volume | 57,500 MT laid continuously |
Beyond the Numbers: What This Means for AP Development
The 343-km access-controlled greenfield corridor isn't just a road; it’s an economic engine for Andhra Pradesh.
Drastic Travel Time Reduction: The journey from Bengaluru to Vijayawada is set to drop from 12 hours to just 6 hours, effectively cutting the travel time by half.
Rayalaseema’s Revival: By passing through Kadapa and near Puttaparthi, the highway provides the Rayalaseema region direct, high-speed access to the IT hubs of Bengaluru and the administrative core of Vijayawada/Amaravati.
Industrial Synergy: The corridor connects directly to the Koparthy Industrial Node, making it a magnet for logistics, warehousing, and manufacturing units.
Engineering Excellence: Supported by IIT Bombay, the project utilized 70 tippers, 5 hot mix plants, and 17 rollers working in perfect synchronization to ensure quality while maintaining record-breaking speed.
Strategic Highlights of NH-544G
Eco-Friendly Design: Includes a 5.3 km long tunnel and sensitive construction across a 21-km forest stretch.
World-Class Amenities: Features 17 interchanges and 10 major wayside amenities for travelers.
Shorter Route: Reduces the total distance between the two cities by approximately 100 km (from 635 km to 535 km).
Leadership Voices: Pride of the Nation
"This is the New India" – CM Chandrababu Naidu
Andhra Pradesh Chief Minister N. Chandrababu Naidu expressed immense pride, noting that this milestone signals AP's prominence on the world stage.
"Not China, not Germany, not the United States. This is the new India setting new records in road building, right here in Andhra Pradesh. This extraordinary achievement reflects the spirit of New India – quick, ambitious, and world-class. Congratulations to NHAI and Rajpath Infracon for achieving four Guinness World Records in a single week. We thank the Central Government for its steadfast support and look forward to more such milestones in nation-building."
"Global Benchmarks in Engineering" – Nitin Gadkari
Union Minister for Road Transport and Highways, Nitin Gadkari, credited the success to visionary leadership and technical innovation, stating:
"Setting new global benchmarks in highway engineering, NHAI has created history. Under the visionary leadership of PM Shri Narendra Modi Ji, these achievements highlight India’s rising leadership in world-class highway infrastructure.
These records were achieved with the blessings of Bhagwan Sathya Sai and the seamless cooperation of the AP government. We are transforming 'knowledge into wealth' through innovation and speed.
How It Was Done: The "War Room" Strategy
The project was a massive logistical symphony, monitored by IIT Bombay to ensure that speed did not compromise quality.
Manpower & Machinery: 70 tippers, 5 hot mix plants, and 17 rollers worked in a continuous loop.
Green Innovation: The corridor includes a 5.3 km tunnel and 21 km of forest-friendly sections.
Distance Reduction: Once complete, the travel distance between Bengaluru and Vijayawada will drop by 100 km, and travel time will be slashed from 12 hours to just 8 hours.
Frequently Asked Questions (FAQs)
Q1: Which highway holds the Guinness World Record for the fastest paving?
The Bengaluru–Kadapa–Vijayawada Economic Corridor (NH-544G) currently holds multiple records, including 156 lane-km of continuous paving and 28.89 lane-km within a 24-hour window.
Q2: How does this project benefit the common traveler in AP?
Travelers will save roughly 6 hours on the Bengaluru-Vijayawada route. The road is designed for a top speed of 120 kmph, providing a safer and smoother experience compared to existing congested routes.
Q3: Who were the partners in this achievement?
The records were achieved by NHAI and the concessionaire Rajpath Infracon Private Limited, with quality monitoring and technical support from IIT Bombay.
This highway is a testament to the "Gati Shakti" vision, proving that Andhra Pradesh is ready for world-class investment and rapid urban growth.

Comments
Post a Comment